1

Banner image

FACILITY TOUR

INTRODUCTION

Welcome to the OEM facility Tour and introduction to our remanufacturing process. Please explore our facility by using your arrow keys or any one of the other controls. We hope you enjoy the tour.

2

Banner image

FACILITY TOUR

CORE RECEIVING

Where all components enter the facility. Once unloaded from a flatbed, a thorough inspection of the component is done to record the part number, serial number, and the condition of the component. This information is compiled into the receiving report, and used to create a Work Order. Once a Work Order is created, the Customer Service team confirms the work to be done on the component.

3

Banner image

FACILITY TOUR

DISASSEMBLY

Where the components are disassembled into individual piece parts (right down to nuts and bolts). This is where the condition of the component is observed by the technical team in order to write detailed reports for the customer

4

Banner image

FACILITY TOUR

CLEANING COMPONENTS

All of the components flowing through OEM's facility must be thoroughly cleaned in order to be properly inspected. Parts are blasted using plastic media, sand, and shot peen, as well as washed in soap typhoon and caustic washers.

5

Banner image

FACILITY TOUR

INSPECTION

Parts are sent to the inspection area to determine if they are reusable as-is or if they are eligible for salvage. Various NDT (nondestructive testing) techniques are used (ultrasonic, mag particle, and liquid penetrant) to determine reusability.Parts are sent to the inspection area to determine if they are reusable as-is or if they are eligible for salvage. Various NDT (nondestructive testing) techniques are used (ultrasonic, mag particle, and liquid penetrant) to determine reusability.

6

Banner image

FACILITY TOUR

SALVAGE

OEM’s comprehensive 75,000 square foot machine shop can accommodate all machining work that may be required for the remanufacture of a component, including spray and fabrication welding capabilities, chroming, and HVOF.

7

Banner image

FACILITY TOUR

SUB-ASSEMBLY

In 2008, OEM found out that building engines could be done faster and with more consistency by assembling sub-components of the engines separately and then bolting them on when the engine is ready for them. OEM now has 8 sub-assemblies to reduce the turnaround time through the facilityIn 2008, OEM found out that building engines could be done faster and with more consistency by assembling sub-components of the engines separately and then bolting them on when the engine is ready for them. OEM now has 8 sub-assemblies to reduce the turnaround time through the facility

8

Banner image

FACILITY TOUR

ASSEMBLY

The component is assembled back to like-new condition using reused, salvaged and new parts.

9

Banner image

FACILITY TOUR

TESTING

All engines and transmissions are tested in our state of the art testing facilities. There are two engine dynamome-ters. The smaller dyno is rated for 2750 hp and the larger dyno is rated for 7000 hp. The large transmission test bench is rated for 600 hp to test the 797 transmissions.

10

Banner image

FACILITY TOUR

MATERIAL HANDLING

Each component, upon arrival in the facility or upon disassembly, is assigned a work order and corresponding barcode so that it can be tracked using OEM’s Warehouse Management System.

Thank you we hope you enjoyed your tour.